Loading...

About this property

Industrial Park 360 has the best location at the entrance of the Saltillo-Mty highway and the Saltillo-Mexico highway, has 24-hour security and is built to suit.

Land Area: 10,000 m2 | 107,639 SF.
Construction Area: 5,040 m2 | 54,250 SF.
Workshop Area: Designed to fit into 2157 square feet of space.
Minimum clear height: 28 ft.
Bay size: 50" x 55"
Sleeve based on SSR-KR 18 PIN Z4 pin white background, with 3" thick fiberglass insulation.